( Read more about this mission click here)
The 177ft MST is rolled back after launch is scrubbed at T-58
seconds Feb.8th.
On Feb. 9th the launch was scrubbed again because this P-3 had a mechanical
problem and could not relay telemetry back to Mission Control.
The Delta II awaits launch!
Liftoff occurred at 9:43:44am PST Feb.11, 2002.
Here is a close-up of main engine ignition.
A wide angle photo with the MST.
This photo was taken from 3.29 miles away at the Press Site.
One last look at SLC-2 and the Delta II well on its way.